The challenge in the project
manufacture of chocolates and in particular foil wrapped chocolates, assortments, truffles and nuts covered in chocolate, wanted to have new production facilities to match its development. The firm entrusted the teams at GEDOUIN INGENIERIE to carry out this work.
Our response
GEDOUIN INGENIERIE worked alongside their client from the start of the project taking into account all of the factors. The work carried out in fifteen months is able to produce 52,000 tonnes of bars of chocolate each year. It involved the installation of a solar panel system on the roof (11,000 m²) capable of producing sustainable energy (750 kW). This building with a surface developed over 32,000 m² with the installation of a 2000 tonne metal frame.
Technical features
Type of building
Agri-food factoryCity
Perpignan (66)State of the project
BuiltDelivery date
2008Construction time
15Built surface
32730
Our other construction project
Production units, warehouses, offices: take a look at all the turnkey projects we have designed for our clients.
News and advice
News and our skills
See our latest news and get advice from our experts to build your project in the best possible conditions.
Follow us on social networks to keep up to date with our latest news.