GROUPE CEMOI

GROUPE CEMOI


Built

The CEMOI Group relied on GEDOUIN INGENIERIE to design and build its new chocolate processing factory in Perpignan (Pyrénées Orientales).

The challenge in the project


manufacture of chocolates and in particular foil wrapped chocolates, assortments, truffles and nuts covered in chocolate, wanted to have new production facilities to match its development. The firm entrusted the teams at GEDOUIN INGENIERIE to carry out this work.

Our response


GEDOUIN INGENIERIE worked alongside their client from the start of the project taking into account all of the factors. The work carried out in fifteen months is able to produce 52,000 tonnes of bars of chocolate each year. It involved the installation of a solar panel system on the roof (11,000 m²) capable of producing sustainable energy (750 kW). This building with a surface developed over 32,000 m² with the installation of a 2000 tonne metal frame.

Technical features


  • Type of building

    Agri-food factory
  • City

    Perpignan (66)
  • State of the project

    Built
  • Delivery date

    2008
  • Construction time

    15
  • Built surface

    32730

PHOTO COL GROUPE CEMOI PERPIGNAN 66 181113 01


A project in mind ?

Do you wish to build food processing factory? Tell us about your project to obtain a turnkey solution.

Contact us

Our other construction project


Production units, warehouses, offices: take a look at all the turnkey projects we have designed for our clients.

News and advice

News and our skills


See our latest news and get advice from our experts to build your project in the best possible conditions.


Follow us on social networks to keep up to date with our latest news.