LOSTE TRADI-FRANCE

LOSTE TRADI-FRANCE


Built

LOSTE TRADI-France relied on GEDOUIN INGENIERIE to build a controlled temperature logistics warehouse in Saint Florent le Vieil (Maine-et-Loire).

The challenge in the project


LOSTE TRADI-FRANCE, a firm specialising in the manufacture of dried sausages, dried and cooked hams for almost 150 years, has seen steady growth in its business. In order to match this development, the firm wanted to build a new logistics platform.

Our response


GEDOUIN INGENIERIE worked with LOSTE TRADI-FRANCE on the design and construction of a logistics platform. This building erected in less than a year, is based around a 1950 m² storage area, a1770 m² area for pallets, 500 m² of offices and staff rooms and 400 m² of technical areas.

Technical features


  • Type of building

    Controlled temperature warehouse
  • City

    Saint Florent le Vieil (49)
  • State of the project

    Built
  • Delivery date

    2008
  • Type of market

    Project management
  • Built surface

    5630

PHOTO COL LOSTE TRADI FRANCE MAUGES SUR LOIRE 49 181113 01


A project in mind ?

Do you wish to build food processing factory? Tell us about your project to obtain a turnkey solution.

Contact us

Our other construction project


Production units, warehouses, offices: take a look at all the turnkey projects we have designed for our clients.

News and advice

News and our skills


See our latest news and get advice from our experts to build your project in the best possible conditions.


Follow us on social networks to keep up to date with our latest news.